Alton is a terminus station at the end of the Alton Main Line. It is served by South Western Railway services from London Waterloo, and acts as a connection to the Watercress Line Heritage Railway. This simulation includes the area around Alton station, and the Alton Main Line up to Pirbright Junction with the South Western Main Line. It also includes part of the line from Aldershot towards Ascot.

A timetable for 29 June 2022 has been included, running from 04:20 until the last train of the evening, at approximately 1am. The standard services are:

– 2tph London Waterloo to Alton
– 2tph Guildford to Farnham
– 2tph Ascot to Aldershot

All services are operated by South Western Railway.

Additionally, services on the Watercress Line and some railhead treatment trains have been included, as well as the extra peak services.

Some operational tips have been included in the download – it is recommended these are read before attempting the simulation!

Download it here.

Pin It on Pinterest

Shares
Share This