This railway fills in the routes between existing northwest simulations – Crewe, Chester (Merseyrail), Liverpool Lime Street and Manchester Area. It is very heavily used by both passenger and freight services, the timetable covering a full eight-hour shift from 06:00 until 14:00 from the 2024 winter working timetable. After 14:00 services begin to dwindle and all are finished just before 15:05. Trains will be seen to move quite slowly as the area covers quite long distances, except within the Warrington and Stockport station areas

Download it here

Pin It on Pinterest

Shares
Share This