This simulation covers the Shakespeare Line between Tyseley and Stratford-upon-Avon, the Chiltern Main Line between Tyseley and Hatton, and the Stratford to Leamington Line between Hatton and Stratford-upon-Avon.

Included is a full day timetable representing 2nd April 2025, including all passenger, freight and ECS services.

Off peak services are as follows:
– 1tph London Marylebone to Birmingham Moor Street
– 1tp2h London Marylebone to Birmingham Snow Hill
– 1tp2h Leamington Spa to Birmingham Moor Street
– 1tp2h Leamington Spa to Stratford-upon-Avon
– 1tph Stratford-upon-Avon to Worcester Foregate Street via Dorridge
– 1tph Dorridge to Worcester Foregate Street
– 1tph Stratford-upon-Avon to Kidderminster via Whitlocks End
– 1tph Whitlocks End to Kidderminster
– Irregular Newcastle – Reading CrossCountry services

Some operational tips are available in the included documentation.

Please Note: The included timetable requires program version 2.23.0 or later to run.

Download it here

Pin It on Pinterest

Shares
Share This