This simulation covers the Lea Valley Lines out of London Liverpool Street (not included). London Overground services to Chingford, Enfield Town and Cheshunt are included, as well as Greater Anglia services to Hertford East and log distance services onto the West Anglia Main Line.

A full day timetable replicating spring 2022 services has been included. The standard off peak service includes:
– 4tph London Liverpool Street to Chingford (LO)
– 2tph London Liverpool Street to Enfield Town (LO)
– 2tph London Liverpool Street to Cheshunt (LO)
– 2tph London Liverpool Street to Stansted Airport (SX)
– 2tph London Liverpool Street to Hertford East (GA)
– 2tph London Liverpool Street to Cambridge North (GA)
– 2tph Stratford to Bishops Stortford (GA)
– 2tph Stratford to Meridian Water (GA)

Some operational tips have been included in the documentation file regarding aspects of the simulation that are complicated to operate. Always keep an eye on the service details, as some services may have a different route to normal.

Download it here

Pin It on Pinterest

Shares
Share This