Aug 3, 2022 | News, Railway Projects |
This simulation includes the North Downs Line from Reading to Guildford, the Waterloo to Reading line from Reading to Staines, the Frimley line from Ascot to Frimley and the Chertsey line from Virginia Water to Addlestone. A timetable for 3rd August 2022 has been...
Jul 31, 2022 | News, Railway Operation Simulator |
The main new features in this release are random delays at locations, random points and signal failures, and temporary speed restrictions. These are described in section 6.13 of the user manual and on-screen help. The Actions Due and Performance logs look the...
Jul 24, 2022 | News, Railway Projects |
All commuter and regional lines in Barcelona (Spain). 24 hours working day, with rush time intervals at 06:40-08:00, 10:30-11:00, 12:45-13:45, 16:00-16:35, 18:30-19:30 and 21:10-22:00. Download it here
Jul 10, 2022 | News, Railway Projects |
This layout simulates the central section of the Elizabeth Line, running through newly opened tunnels under, in the summer of 2022. The line operates a service between Paddington and Abbey Wood. At this time services do not continue past Paddington or towards...
Jul 6, 2022 | News, Railway Projects |
The West of England Main Line forms the majority of the route between London Waterloo and Exeter, starting at Basingstoke where it splits from the South West Main Line. The route is unelectrified single track with passing loops, and is operated by South Western...
Jun 25, 2022 | News, Railway Projects |
Alton is a terminus station at the end of the Alton Main Line. It is served by South Western Railway services from London Waterloo, and acts as a connection to the Watercress Line Heritage Railway. This simulation includes the area around Alton station, and the Alton...