Aug 28, 2022 | News, Railway Projects |
The North Downs Line runs from Reading to Redhill along the North Downs, a ridge of hills through Southern England. This simulation covers the eastern section, from Guildford to Redhill. This line has limited signalling along most its length, meaning trains can catch...
Aug 25, 2022 | News, Railway Projects |
Maintain the minimal possible time free of freight traffic, the commuter and local line. You must to find the correct signalling work, to avoid delay service. The “classification” function was finished, and the concerned building was demolished on spring...
Aug 13, 2022 | News, Railway Projects |
All traffic at NorthWest of Catalonia (Spain). Peak timetable at 08:30 to 09:00, 10:45 to 11:45 and 14:20 to 15:45. Pay attention to “Actions Due” timetable, to give priority signalling to AVXX high speed trains (A.V.E.). Some freighter manual challenging...
Aug 3, 2022 | News, Railway Projects |
This simulation includes the North Downs Line from Reading to Guildford, the Waterloo to Reading line from Reading to Staines, the Frimley line from Ascot to Frimley and the Chertsey line from Virginia Water to Addlestone. A timetable for 3rd August 2022 has been...
Jul 24, 2022 | News, Railway Projects |
All commuter and regional lines in Barcelona (Spain). 24 hours working day, with rush time intervals at 06:40-08:00, 10:30-11:00, 12:45-13:45, 16:00-16:35, 18:30-19:30 and 21:10-22:00. Download it here
Jul 10, 2022 | News, Railway Projects |
This layout simulates the central section of the Elizabeth Line, running through newly opened tunnels under, in the summer of 2022. The line operates a service between Paddington and Abbey Wood. At this time services do not continue past Paddington or towards...