Jan 25, 2024 | News, Railway Projects |
The simulation includes Manchester’s main city stations and surrounding areas close to the city. The timetable corresponds to the current winter working timetable including passenger and freight services, and empty coaching stock. It covers an eight hour shift...
Jan 20, 2024 | News, Railway Projects |
This simulation covers the East Coast Main Line (ECML) from Hitchin (excl) to Grantham (excl), as well as few miles of the following branches: Fletton (Orton Mere Line), March, Spalding , and Stamford. In the focus of the simulation is Peterborough Station with...
Jan 13, 2024 | News, Railway Projects |
An updated version of this railway (v2.0) is now available incorporating an additional timetable for 30-20-30 minute headway based on Saturday/Sunday/Public Holiday pattern. The 80km (50mi) network currently consists of three lines: – Line E, which is an airport...
Jan 5, 2024 | News, Railway Projects |
The trains in daily operation are ATP-equipped Bombardier Electrostar EMUs that run in consists of 4- or 8-cars and general on-track machines during engineering hours. The included timetable is based on an actual Tuesday to Friday 10 minute headway pattern on the...
Dec 30, 2023 | News, Resources |
This is a python program that reads the ‘Fns’ times of all services in a .ttb file and changes all follow on services’ ‘Sns’ times to match in a new .ttb file Download it here
Nov 27, 2023 | News, Railway Projects |
Usual railway operations activity at NorthEast of Catalonia (SPAIN) Initial moderate merchant trains operations before high speeds and commuters traffic startings. High speed trains (A.V.E. and A.V.L.O.) have priority signaling over commuter and merchant trains....