Description
This project covers the route from just south of Stoke Junction to just north of the Carlton Loop, with the branch lines at Grantham (to Nottingham) and Newark (to Nottingham and Lincoln), including the Newark Flat Crossing. A total of 2 stations and 11 level crossings to manually operate on a high-speed mainline.
A modern timetable from a weekday in March 2023 is included, with train operators Grand Central (GC), East Midlands Railway (EMR), Hull Trains (HT), London North Eastern Railway (LNER) and Lumo.
For a more detailed description and a few minor operational notes, see the ‘ReadMe’ notepad.
Steve_H –
I get syntax error 07:20;dsc;Nottingham -> Skegness (EMR Class 170) if I delete this train I then get on another. I can’t work out why?
Albert –
After reading Steve_H’s review I checked this route and it works fine in the later versions of RailOS (v2.15.0 or v2.15.1). The ‘dsc’ command was new at v2.15.0 so I assume Steve_H must be using an earlier version, which will give errors as the timetable validator won’t recognise the command.
Steve_H –
Hi I upgraded the other day. Just downloaded & tried it again & works without any errors.